Anti-theft markings help deter the theft of your vehicle, and permanent, traceable ID codes help enable its recovery.
Premium Window Tint
Price:
$11/mo*
Total: $699
LoJack Theft Recovery
Price:
$14/mo*
Total: $895
LoJack Upgrade
Price:
$14/mo*
Total: $895
3. Value Your Trade
Blue Book® Trade-In Value
The Kelley Blue Book® Trade-in Value is Kelley Blue Book's estimate of what a consumer can expect to receive from a dealer for a trade-in vehicle assuming an accurate appraisal of condition. This value will likely be less than the Kelley Blue Book® Private Party Value because the reselling dealer incurs the cost of safety inspections, reconditioning and other costs of doing business.
We're sorry, but KBB doesn't have a trade value for this vehicle and configuration.
20/21 in. M Dual-Spoke Jet Black 951M Wheels - Includes 20.0 in. x 10.5 in. front and 21.0 in. x 11.0 in. rear alloy wheels with 285/40R20 front and 295/35R21 rear staggered high performance tires.
Front Ventilated Seats -
M Drive Professional - Includes M Drift Analyzer and M Laptimer.
Rear Manual Side Window Shades -
Heated Front and Rear Seats -
Driving Assistance Professional Package - Includes Driving Assistant Professional, traffic jam assistant, lane change assistant, and partial automated driving (includes hands-free driving up to 40 mph on selected highways).
BMW Iconic Glow Kidney Grille -
Carbon Fiber Silver Thread High Gloss Interior Trim w/Dark Silver Accent -
Executive Package - Includes BMW Iconic Glow kidney grille, rear manual side window shades, Parking Assistant Plus, interior camera, front ventilated seats, and front and rear heated seats.
entertainment
Auxiliary audio input: Bluetooth
Auxiliary audio input: iPod/iPhone
Auxiliary audio input: USB
Connected in-car apps: Amazon Alexa
Connected in-car apps: Google POIs
Connected in-car apps: Google search
Digital sound processing:
Infotainment screen size: 14.9 in.
Internet radio app: Spotify
Premium brand: Bowers & Wilkins
Radio data system:
Radio: AM/FM
Radio: HD radio
Radio: touch screen display
Radio: voice operated
Satellite radio: SiriusXM
Smartphone integration: wireless Android Auto
Smartphone integration: wireless Apple CarPlay
Speed sensitive volume control:
Subwoofer: 2
Surround sound:
Total speakers: 16
Watts: 655
performance and engineering
Hill holder control:
Stability control:
Suspension: Active suspension:
Suspension: Driver adjustable suspension: ride control
Suspension: Front shock type: twin-tube gas
Suspension: Front spring type: coil
Suspension: Front stabilizer bar:
Suspension: Front struts:
Suspension: Front suspension classification: independent
Suspension: Front suspension type: double wishbone